As Utility Coordination Lead, SG3 provided oversight of design, packaging and integration of a major underground electrical transmission line relocation. This high-pressure fluid-filled 115 kV line crossed BNSF railroad tracks on a new bridge, while the existing line remained in service during bridge construction. Also managed the constructability and protection during other work and provided construction sequencing.